Framing of interior walls is complete

Our new home is taking shape rapidly! The steel studs that frame the interior have all been erected. We can walk down the hallway and visualize the spacious dance studios, dressing rooms, seating nooks and restrooms. Watching this take shape is truly amazing and Virginia and I have to pinch ourselves each time we visit the site. Drywall begins next week.

We are on track for our Sept. 5 opening, but we are still shy of our fundraising goal. Heartfelt thanks to those that have donated. We still need to raise about $250,000 and we need your help. Please donate today.

Studio D: Looking towards the front from the edge of studio D.
Hallway: Looking down the hallway from the entry point, ladies room on the right and studios on the left.

Leave a Reply

Your email address will not be published. Required fields are marked *